Difference between revisions of "Planned Maintenance Schedules"

From SVContheGO Online Manual
Jump to navigation Jump to search
m
m
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
{| border="0" cellpadding="1" cellspacing="1" style="width: 1400px;"
 
{| border="0" cellpadding="1" cellspacing="1" style="width: 1400px;"
 
|-
 
|-
| colspan="4" | [[File:PMSch ccexpress.png|PMSch ccexpress.png]]
+
| colspan="4" | [[File:PMEdit.jpg|PMEdit.jpg]]
 +
|-
 +
| colspan="4" style="width: 265px;" |  
 +
|-
 +
| colspan="4" | [[File:PMSearch.jpg|PMSearch.jpg]]
 
|-
 
|-
 
| class="navigationTitles" colspan="4" | Navigation
 
| class="navigationTitles" colspan="4" | Navigation
Line 42: Line 46:
 
| class="headerMainTitles" colspan="4" id="defaultsTab" | Defaults Tab
 
| class="headerMainTitles" colspan="4" id="defaultsTab" | Defaults Tab
 
|-
 
|-
| colspan="4" | [[File:PMDefaultsTab ccexpress.png|PMDefaultsTab ccexpress.png]]
+
| colspan="4" | [[File:PMDefaultsTab.jpg|PMDefaultsTab.jpg]]
 
|-
 
|-
 
| class="navigationTitles" colspan="4" | Overview
 
| class="navigationTitles" colspan="4" | Overview
Line 81: Line 85:
 
| class="headerMainTitles" colspan="4" id="freqTab" | Frequency of Visit Tab
 
| class="headerMainTitles" colspan="4" id="freqTab" | Frequency of Visit Tab
 
|-
 
|-
| colspan="4" | [[File:PMSchFreq ccexpress.png|PMSchFreq ccexpress.png]]
+
| colspan="4" | [[File:PMFreqTab.jpg|PMFreqTab.jpg]]
 
|-
 
|-
 
| class="navigationTitles" colspan="4" | Overview
 
| class="navigationTitles" colspan="4" | Overview
Line 90: Line 94:
 
|-
 
|-
 
| colspan="4" style="width: 265px;" | <span style="font-size:large;">•</span>&nbsp;Create schedules that end by an exact, after a number of jobs or never.
 
| colspan="4" style="width: 265px;" | <span style="font-size:large;">•</span>&nbsp;Create schedules that end by an exact, after a number of jobs or never.
 +
|-
 +
| Once jobs have been generated the frequency options as well as the end options cannot be changed. However, the schedule can be extended using the Update Schedule feature. The remainder of the schedule can be removed and recreated using the saved frequency and ending options with new start and ending parameters.
 
|-
 
|-
 
| &nbsp;
 
| &nbsp;
Line 102: Line 108:
 
| class="headerMainTitles" colspan="4" id="equipTab" | Equipment Tab
 
| class="headerMainTitles" colspan="4" id="equipTab" | Equipment Tab
 
|-
 
|-
| colspan="4" | [[File:PMSchEQ ccexpress.png|PMSchEQ ccexpress.png]]
+
| colspan="4" | [[File:PMEQTab.jpg|PMEQTab.jpg]]
 
|-
 
|-
 
| class="navigationTitles" colspan="4" | Overview
 
| class="navigationTitles" colspan="4" | Overview
Line 123: Line 129:
 
| class="headerMainTitles" colspan="4" id="materialsTab" | Materials Tab
 
| class="headerMainTitles" colspan="4" id="materialsTab" | Materials Tab
 
|-
 
|-
| colspan="4" | [[File:PMSchMaterials ccexpress.png|PMSchMaterials ccexpress.png]]
+
| colspan="4" | [[File:PMMaterialsTab.jpg|PMMaterialsTab.jpg]]
 
|-
 
|-
 
| class="navigationTitles" colspan="4" | Overview
 
| class="navigationTitles" colspan="4" | Overview
Line 140: Line 146:
 
| class="headerMainTitles" colspan="4" id="jobsTab" | Jobs Tab
 
| class="headerMainTitles" colspan="4" id="jobsTab" | Jobs Tab
 
|-
 
|-
| colspan="4" | [[File:PMSchJob ccexpress.png|PMSchJob ccexpress.png]]
+
| colspan="4" | [[File:PMJobsTab.jpg|PMJobsTab.jpg]]
 
|-
 
|-
 
| class="navigationTitles" colspan="4" | Overview
 
| class="navigationTitles" colspan="4" | Overview

Latest revision as of 09:12, 16 August 2024

PMEdit.jpg
 
PMSearch.jpg
Select Agreements > Planned Maintenace
Planned maintenance shedules are used to create recurring jobs.  Schedules can be attached to an agreement.
 Defaults Tab
 Frequency of Visit Tab
 Equipment Tab
 Materials Tab
 Jobs Tab
Fields
Customer Name PM Type
Site Servicer
ID Description
Active  
 Top
Defaults Tab
PMDefaultsTab.jpg
The PM Schedule defaults tab contains the schedule settings.  Some of the options are derived from the schedule type, but can be changed during setup.
 
Fields
Job Type  
Service Type Description
Priority  
Status  
Task Code Material Group Code
Request  
       
 Top
Frequency of Visit Tab
PMFreqTab.jpg
The Frequency of Visit tab is used to establish the schedule's calendar.
 Setup  Daily, Weekly Monthly or Yearly calendar of jobs.
 Create schedules that end by an exact, after a number of jobs or never.
Once jobs have been generated the frequency options as well as the end options cannot be changed. However, the schedule can be extended using the Update Schedule feature. The remainder of the schedule can be removed and recreated using the saved frequency and ending options with new start and ending parameters.
       
 Top
Equipment Tab
PMEQTab.jpg
The Equipment tab displays a list of all equipment attached to the schedule.  Equipment can be added to the schedule or inactivated.
 Filter Results Grid by equipment attached to the schedule, inactive equipment or active equipment not assigned to the schedule. 
 Filter using the equipment code and equipment types.
       
 Top
Materials Tab
PMMaterialsTab.jpg
The Materials tab displays a list of materials that will be used on the jobs. 
       
 Top
Jobs Tab
PMJobsTab.jpg
The Jobs tab displays a list of jobs generated for the schedule.
 Filter the Results Grid by Job Status.
       
 Top