Difference between revisions of "Planned Maintenance Schedules"

From SVContheGO Online Manual
Jump to navigation Jump to search
m
m
Line 37: Line 37:
 
|-
 
|-
 
| colspan="4" |  [[Planned_Maintenance_Schedules#top|Top]]
 
| colspan="4" |  [[Planned_Maintenance_Schedules#top|Top]]
 +
----
 
|-
 
|-
 
| class="headerMainTitles" colspan="4" id="defaultsTab" | Defaults Tab
 
| class="headerMainTitles" colspan="4" id="defaultsTab" | Defaults Tab
Line 82: Line 83:
 
|-
 
|-
 
| colspan="4" |  [[Planned_Maintenance_Schedules#top|Top]]
 
| colspan="4" |  [[Planned_Maintenance_Schedules#top|Top]]
 +
----
 
|-
 
|-
 
| class="headerMainTitles" colspan="4" id="freqTab" | Frequency of Visit Tab
 
| class="headerMainTitles" colspan="4" id="freqTab" | Frequency of Visit Tab
Line 107: Line 109:
 
|-
 
|-
 
| colspan="4" |  [[Planned_Maintenance_Schedules#top|Top]]
 
| colspan="4" |  [[Planned_Maintenance_Schedules#top|Top]]
 +
----
 
|-
 
|-
 
| class="headerMainTitles" colspan="4" id="equipTab" | Equipment Tab
 
| class="headerMainTitles" colspan="4" id="equipTab" | Equipment Tab
Line 132: Line 135:
 
|-
 
|-
 
| colspan="4" |  [[Planned_Maintenance_Schedules#top|Top]]
 
| colspan="4" |  [[Planned_Maintenance_Schedules#top|Top]]
 +
----
 
|-
 
|-
 
| class="headerMainTitles" colspan="4" id="materialsTab" | Materials Tab
 
| class="headerMainTitles" colspan="4" id="materialsTab" | Materials Tab
Line 152: Line 156:
 
|-
 
|-
 
| colspan="4" |  [[Planned_Maintenance_Schedules#top|Top]]
 
| colspan="4" |  [[Planned_Maintenance_Schedules#top|Top]]
 +
----
 
|-
 
|-
 
| class="headerMainTitles" colspan="4" id="jobsTab" | Jobs Tab
 
| class="headerMainTitles" colspan="4" id="jobsTab" | Jobs Tab

Revision as of 16:36, 12 April 2022

PMSch ccexpress.png
Select Agreements > Planned Maintenace
Desc Here
• Defaults Tab
• Frequency of Visit Tab
• Equipment Tab
• Materials Tab
• Jobs Tab
Fields
Customer Name PM Type
Site Servicer
ID Description
Active  
 Top
Defaults Tab
PMDefaultsTab ccexpress.png
Desc Here
• 
• 
• 
• 
• 
Fields
Job Type  
Service Type Description
Priority  
Status  
Task Code Material Group Code
Request  
       
 Top
Frequency of Visit Tab
PMSchFreq ccexpress.png
Desc Here
• Setup  Daily, Weekly Monthly or Yearly calendar of jobs.
• Create schedules that end by an exact, after a number of jobs or never.
• 
• 
• 
       
 Top
Equipment Tab
PMSchEQ ccexpress.png
Desc Here
• Filter Results Grid by equipment attached to the schedule, inactive equipment or active equipment not assigned to the schedule. 
• Filter using the equipment code and equipment types.
• 
• 
• 
       
 Top
Materials Tab
PMSchMaterials ccexpress.png
Desc Here
       
       
 Top
Jobs Tab
PMSchJob ccexpress.png
Desc Here
• Filter the Results Grid by Job Status.
• 
• 
• 
• 
       
 Top