Material Group Codes

From SVContheGO Online Manual
Revision as of 10:45, 11 July 2024 by Ascentadmin (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PMGroupCodes.jpg
To access Material Group Codes, select the setup COG > Setup > Planned Maintenance > Material Group Codes
Used in planned maintenace to organize materials that can be assigned to jobs by group.
Fields
Material Group Code Description Active
     
Back to Setting Up SVCONTHEGO