Task Codes
Jump to navigation
Jump to search
Navigation | |||
To access Task Codes, select the setup COG > Setup > Planned Maintenance > Task Codes | |||
Overview | |||
Task Codes can be used to create a materials list that will be automatically assigned to the newly created planned maintenance jobs. | |||
Fields | |||
Task Code | Description | Active | |
Details | |||
The details section is used to manage the materials that are assigned to the Task Code. | |||
Options | |||
• Group Only: Select to add a Task Code Group to the Task Code | |||
• Group With Item: Select to add an item from a Group to the Task Code. | |||
• Item Only: Select to add an item only to the Task Code. | |||
Back to Setting Up SVCONTHEGO |