Difference between revisions of "Task Codes"

From SVContheGO Online Manual
Jump to navigation Jump to search
m
m
Line 39: Line 39:
 
|-
 
|-
 
| colspan="4" style="width: 265px;" | <span class="dotContentHeader">•</span> Item Only: Select to add an item only to the Task Code.
 
| colspan="4" style="width: 265px;" | <span class="dotContentHeader">•</span> Item Only: Select to add an item only to the Task Code.
 
+
|-
 +
| &nbsp;
 
|-
 
|-
 
| [[Setting_Up_SVCONTHEGO|Back to Setting Up SVCONTHEGO]]
 
| [[Setting_Up_SVCONTHEGO|Back to Setting Up SVCONTHEGO]]

Revision as of 11:02, 11 July 2024

PMTaskCodes.jpg
To access Task Codes, select the setup COG > Setup > Planned Maintenance > Task Codes
Task Codes can be used to create a materials list that will be automatically assigned to the newly created planned maintenance jobs.
Fields
Task Code Description Active
     
PMTaskCodes1.jpg
To access Task Codes, select the setup COG > Setup > Planned Maintenance > Task Codes
The details section is used to manage the materials that are assigned to the Task Code.
Options
 Group Only: Select to add a Task Code Group to the Task Code
Group With Item: Select to add an item from a Group to the Task Code.
Item Only: Select to add an item only to the Task Code.
 
Back to Setting Up SVCONTHEGO